(function(w,d,s,l,i){w[l]=w[l]||[];w[l].push({'gtm.start': new Date().getTime(),event:'gtm.js'});var f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:'';j.async=true;j.src= 'https://www.googletagmanager.com/gtm.js?id='+i+dl;f.parentNode.insertBefore(j,f); })(window,document,'script','dataLayer','GTM-PBBN2XH9');
Server racks with illuminated indicators

Bell Aliant:

vector-image

Next Generation data center

Multi-trade services that consisted of the design-build of a greenfield purpose built, Uptime Certified, Tier 3 facility.

  • Location:Saint John, NB
  • Trades:Electrical, Mechanical, Civil
  • Date:March 2015
vector-image

Scope of work and outcome

The electrical scope included the installation of Power Distribution Equipment, Security, CCTV, Life Safety and Critical Systems Infrastructure.The mechanical scope involved the installation of Cooling/HVAC Equipment with associated piping and controls, as well as Diesel Fuel System.The State Group acted as the General Contractor in partnership with IBM Global Services, the Prime vendor contractor for the design, build and commissioning of this greenfield colocation data center.

The State Group managed and executed the development and equipment installation of the first phase of the data center, which included approximately 7,000 square feet of IT space.

Rows of server racks with illuminated indicators

Related Projects

Compression Engine Installation for TC Energy

York University

Fiber-Optic communications cabling & infrastructure upgrades.

Alcoa Warrick Operations

Ongoing civil, electrical, HVAC, ironwork, piping, and millwrighting services since 2000.